One picture, two stories. First the on-going non-operation of the new footbridge, as you can see nothing has happened since I last reported in November [ 1 ]. The bridge is ready to rock as they say; both sides of the river have been landscaped and prepared but it just sits there like some beached whale. No-one has any idea when it will open or if they do they aren't saying. I suspect that like most things money or the lack thereof lies at the bottom of this saga. Money lies at the bottom of the second story too. There have been calls to dredge the river to improve flood defenses. You can see how silted up it's becoming; where that mud is ships once berthed. A figure of £14.6 million was picked out of a hat (where else do they get these figures from?). Fortunately wiser counsels have said it would make little or no difference to water levels in Hull so that scheme looks like a non-starter. Hull is very good at non-starting.
Weird to plan abridge without proper funding.